If informatica has its scheduler why using third party scheduler?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Informatica Interview Questions

Is it necessary to maintain the primary-foreign key relation ship between the targets in informatica while loading using constarint based loading or it is required only at database level ??

1 Answers   IBM,


By using Filter Transformation,How to pass rows that does not satisfy the condition(discarded rows) to another target?

14 Answers   CSC, Emphasis,


how to construct simple biogas digerter? please show me detail drawing and specification of simple biogas construction?

0 Answers  


what is threshold error in informatica?

1 Answers   TCS, Wipro,


What is meant by active and passive transformation?

0 Answers  


Types of error logs in Informatica?

2 Answers  


Data transformed successfully from Source table to target table. Now how you will ensure that the data in Target table is proper. I answered will verify one or two records and check Then question was that the Development is doing (1-2 record verification)but as a tester you have to verify the complete data, how you will do?? Please answer

2 Answers  


Do you have to change the reject file b4 using reject loader utility.

1 Answers  


After dragging the ports of 3 sources sqlserver,oracle,informix to single source qualiofier can we map these ports directly to target and how?

2 Answers  


What is a joiner transformation?

0 Answers  


how many ways can we implement SCD2?

4 Answers   IBM, TCS,


Explain what are the different types of transformation available in informatica. And what are the mostly used ones among them?

0 Answers  


Categories