What is active and passive stage?
No Answer is Posted For this Question
Be the First to Post Answer
I have 3 jobs A,B and C , which are dependent each other. I want to run A & C jobs daily and B job run only on sunday. how can we do it?
How you Implemented SCD Type 1 & Type 2 in your project?
1.When did 8.1 parallel came into existence? 2.What is the difference between 7.5 and 8.1?
If there is a file that contains 1000 records, I need the ouput to contain these 1000 records with the header as file name concatenated with the current timestamp and trailer as the count of records
how to sort two columns in single job in datastage.
What are the types of jobs we have in datastage?
what is A Datastage?
why do u need the IOS upgradation in a FC switch
In Datastage, how you can fix the truncated data error?
what is parameterset?
i have 4 jobs i want run 1job should run on 1node and 2job runon 2node and.... how to make it possible?
What is a merge in datastage?