Complete the given number series 240, 240, 120, 40,?, 2 ?
No Answer is Posted For this Question
Be the First to Post Answer
what is the full form of bpl
15 Answers College School Exams Tests, TCS,
(998-1)(998-2)(998-3).....(998-n)= ? when n>1000
The cost of four dozen proof machine ribbons and five dozen accounting machine ribbons was Rs.160/-. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
11.The addition 742586 + 829430 = 1212016 is incorrect. It can be corrected by changing one digit d, wherever it occurs, to another digit e. Find sum of d and e. A. 6 [DCRU] B. 4 C. 10 D. 8
Raju climbs upstairs a running escalator at 45km/hr and climbs downstairs at 95 km/hr. What is the speed of Raju when escalator is not moving?
How many such letters are there in the word ORIENTAL each of which is as for away from the beginning of the word as when they are arranged alphabetically? (a) None (b) One (c) Two (d) Three (e) More than three
19 boys turn out for hockey. Of these, 11 are wearing hockey shirts and 14 are wearing hockey pants. There are no boys without one or the other. The number of boys wearing full uniform is (A) 3 (B) 5 (C) 6 (D) 8
what is the Aptitude test?
FULL FORM OF R.O.S.H.A.N
In a flight of 600 km, an aircraft was slowed down due to bad weather. Its average speed for the trip was reduced by 200 km/hr and the time of flight increased by 30 minutes. The duration of the fligh is?
for cube and sphere 3 views are similarly draw one such figure?
A finishes a work in 12 days and B finishes same work in 14 days.If they work for a day alternately with A beginning, how many days will it take to complete the work?