How CPU handle an interrupt operations?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Architecture Design AllOther Interview Questions

One House is being constructed by an Civil Engg. all pillars are as per structure, but north side there should be 4 pillars among two at back side were 6" inside from the border and remaining two comes front were placed 1'6" inside. is it ok as per vaastu, else if i alter the alignment what would be the best idea, kindly help me.

0 Answers  


How the Islamic Iwan or stalactite vaulting is accomplished with brick or stone?

0 Answers  


Talk to me about your design philosophy?

0 Answers  


FROM THE WHICH FONT USED MEANS SMALL SIZE TEXT IN A0 SIZE PAPER, NEED TO SITE EXECUTION PURPOSE DRAWING DRAWING NEED TO TAKE PRINT IN A3 SIZE ALSO MEANS WHICH FONT USED MEANS POSSIBLE TO READ BOTH PRINT

1 Answers  


Who is responsible for territory? can you please help me in getting the answer for this

0 Answers  


Define pediment?

1 Answers  


what is the maximum depth at which the open foundation bridge can be done

0 Answers  


What was the Iconoclastic Crisis?

0 Answers  


As an architect, how do you blend contemplory materials used in construction with the natural?

1 Answers  


How CPU handle an interrupt operations?

0 Answers  


We would like to experiment with some kind of eco-building here in this 'Tropical rain forest'. What kind of eco- building techniques do you suggest that we look into?

1 Answers  


How to construct Pile foundation?

1 Answers  


Categories
  • Interior Design Interview Questions Interior Design (21)
  • Architecture Design AllOther Interview Questions Architecture Design AllOther (185)