I am from bangalore, Can any one of suggest which is the best institute for performance testing using Loadrunner? great if you provide near Marthahalli or belandure or outer ring road or KR puram?

Answers were Sorted based on User's Feedback



I am from bangalore, Can any one of suggest which is the best institute for performance testing usin..

Answer / prasanthi

Tech vision is the best load runner training institute in marathahalli which will provide you training along with real time experience.We can also get practicals from them..
Contact:
Techvision
besides Thulasi theater;
Marathahalli
Number:8050148265

Is This Answer Correct ?    2 Yes 0 No

I am from bangalore, Can any one of suggest which is the best institute for performance testing usin..

Answer / priya

Contact Rahul reddy(9343925599)

Is This Answer Correct ?    2 Yes 0 No

I am from bangalore, Can any one of suggest which is the best institute for performance testing usin..

Answer / pravash0000@gmail.com

HI Radhika
I have 4 to 5years experience .I am also givig online traing loadrunner and jmeter .
if you r interested contac me
skype:pk.loadrunner
gmail:pravash0000@gmail.com
ph no:9154931724

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

What is host?

0 Answers  


What is a difference between pacing and think time?

0 Answers  


What is a scenario?

3 Answers   Accenture,


How to record the desktop application in Loadrunner 12.53 version 64 bit window.

0 Answers  


Types of Goals in Goal-Oriented Scenario ?

1 Answers  






How to identify what to correlate and what to parameterize?

0 Answers  


Analysis Scenario (Bottlenecks):?

2 Answers  


what is the function to execute batch jobs?

1 Answers   CTS,


How to find response time in loadrunner?

1 Answers   TCS,


I need to perform a 4hr test run in performance center 9.0 there i need to rampup 10 users after 1 hour. I selected the run tab and added users to down state -> Ready state-> initialise-> Run state. 10 users ramped up successfully for the next 1 iteration only after that the 10 users automatically goes to the stop status. But i want the ramped up users to be carried out for the next 3 hours. Please help me out how to do the rampup successfully for the remaining time period.

1 Answers  


How to modify the script?

0 Answers  


What is correlation? Explain the difference between automatic correlation and manual correlation?

6 Answers  


Categories