Can any deviation be changed into the change control?



Can any deviation be changed into the change control?..

Answer / sumit tyagi

Any deviation can be convert in change control.
.if any deviated procedure have demands any changes after impact evaluation then deviation convert into change control

Is This Answer Correct ?    18 Yes 0 No

Post New Answer

More Pharmacy Interview Questions

How will you calculate telling in any HPLC peak?

1 Answers  


How would you propose to advertise your drug?

0 Answers  


Discuss the potential side effects and risks associated with Alprazolam usage. How would you manage or mitigate these side effects in a patient?

0 Answers  


why we study matrixing in stability system in stability study and on what basis we select time point.

0 Answers   Hetero,


Why Assay and CU test performed differently?

4 Answers   Cipla, Lupin,






what is recovery factor

0 Answers   Jubilant,


What is limit of uniformity of content as per USP?

3 Answers  


what type of column are used in GC

2 Answers  


Which gas is used as a mobile phase in GC?

3 Answers  


how will convience the doctor

0 Answers   Ranbaxy,


What is the limit for friability of tablets?

10 Answers   Glenmark,


What is eCTD? Difference between CTD & eCTD? How it will be prepared? Need of any Software?

2 Answers   Ranbaxy,


Categories