i have a wf i want to run this very day 3 time every 3 hours
how can you scheduled that?
Answer / babu
In the Scheduler we have option called Customized Report. by
selecting Days(s)option in Repeat every option,u can see
Daily Frequency options so select the Run Every option
particular Hours(Gap betwen every run of the WF) your
workflow want to run,after thatselect End after(3 runs)
option of the listin End Options in the main Scheduler tab.
Thanks,
Babu
8861145051
| Is This Answer Correct ? | 3 Yes | 0 No |
What are the advantages of informatica?
What will happen when Mapping variable and Mapping parameter is not defined or given? Where do you use mapping variable and mapping parameter?
how to insert header after each group.
get me output as if input is like 1 x o/p-->1 x,y,z 1 y 2 a,b 1 z 3 c 2 a 2 b 3 c
What are the types of maping in Getting Started Wizard?
What are the Advantages of de normalized data?
I have two different source structure tables, but I want to load into single target table? How do I go about it? Explain in detail through mapping flow.
Whats there in global repository
what are the different types of transformation available in informatica. And what are the mostly used ones among them?
which one is costliest transformation? costliest means occupying more memory. which one Aggregator,sorter,filter,etc..
explain abt union t/r?
Define update strategy?