i want excute multiple sessions in one workflow using the
"start task".what do i need to do?
Answers were Sorted based on User's Feedback
Answer / amedela chandra sekhar
Just give the connections from start task to sessions either
sequential or parallel.
| Is This Answer Correct ? | 0 Yes | 2 No |
can you please explain me pre session and post session options?
What is difference between Informatica 6.2 Workflow and Informatica Workflow 7.1
Hi All, i have question regarding Change Data Capture in Informatica. As i know we can do this using Incremental Aggregation(i never worked on Informatica but i read) and i think we can do the same with SQL Over write and with variables. Can someone tell me how do we do this using other two techniques.. using SQL Over write and variables. Thanks for the help and greatly appreciated.
what is metadata?
in oracle write query yourname+1 from dual
i hav a scenario like this i want load data from source to target as follows frist it counts the num of deptno and display with that with count and how many times it reapts along with all the records in source
Which transformation should we use to normalize the COBOL and relational sources?
4 Answers DELL, IBM, Lehman Brothers,
I have a flat file, want to reverse the contents of the flat file
How is Data Models Used in Practice?
What is staging area?
TWO FLAT FILES ARE THERE , EACH HAVING NO MATCHING COLUMNS . HOW CAN U JOIN THESE TWO USING JOINER TRANSFORMATION ?
If source is having 5000 rows,and if you want to load data into 500 rows to target,if the session runs successfully,how can you verify the target if the rows are successfully loaded or not.