disign the complex job in u r project?(they are aksing only
complex job design and then data flow...)
No Answer is Posted For this Question
Be the First to Post Answer
Tell me the syntax of Configuration file?
Differentiate between Join, Merge and Lookup stage?
What is the flow of loading data into fact & dimensional tables?
Describe stream connector?
How to lode data in sequntional files perform faster?
How can we move a DATASTAGE JOB from Development to Testing environment with the help of a datastage job using unix commands.
my source is sequencial file and my target is dataset. i am running the job in two node configuration file. my source having 10 records how the data move to target?
What are constraints and derivations?
How to remove duplicates in transformer stage? in parallel mode
How can we perform 2nd time extraction of client database without accepting the data which is already loaded in first time extraction?
how will u design file watch jobs?
can any one tell me how to install datastage 8.1 in windows xp with wizard