Answer / krish

1)first v need to create new cognos connection
2)using connection v need to import tables from our database
3)after that v need to create packages
4)after creating package v need to select that package and
rightclick then click on publish..................
......................this is big process but easy process

Is This Answer Correct ?    7 Yes 1 No

how u publish the packages in framework manager..

Answer / mounika

Package is nothing but subset of model information we can
publish ot by right clicking the package and click publish
package .Then package would be publiched to IBM cognos
connections.

Is This Answer Correct ?    0 Yes 0 No

how u publish the packages in framework manager..

Answer / gopal singh

1)first we need to create new cognos connection
2)using connection we need to import tables from our database
3)after that we need to create models using joins between the query items.
4)after creating package we need to select that package and
rightclick then click on publish.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Cognos Interview Questions

Define query studio?

0 Answers  


1.Can we use 2 packages in report studio at a time is there any alternative for this? 2. What are Star Dimensions and Star Facts? 3.What are dimensions and facts in project ? 4.What is difference between 3 NF and Star Schema ? 5. What Is Data Modelling? 6. How much time do u need to create a report ,if u have four dimensions and 1 fact ? 7. How do u create a Model ? 8. How do u connect a Parameter in a list ,such a way it has to show relative objects in Cross tab ? 9. To display region list in separate pages ,how do u do ?

1 Answers  


what are versions of cognos from starting release to latest in the market?

7 Answers   DELL, IBM,


What is main advantage datawarehousing over oracle?

0 Answers  


My problem is as follows I made two pages of the portal; in the first page i have two reports and from one of these i would like to communicate in some way (i.e drill- through?) with the second page that contains four reports (prompt value [product] and three chart [sales revenue, sales quantity and budget]). Particularly I would like to communicate with the report that contains the prompt, passing the Product. How can i drill from the first page of the portal to the second page ? More generally, is it possible to move from one page, containing 2 report, to another page with 4 report, through a drill-through or any other mechanism? Thank in advance.

1 Answers  






What are the different type of securities can we apply in framework manager?

1 Answers  


----------How to cretae a Template?

4 Answers  


3. The vice president of sales has requested a graphical display of the same information provided in our last crosstab report (whatever I mentioned in above question) for an up coming presentation. We need to provide a chart report that shows which regions generate the most revenue and sales volume.

0 Answers  


-------What are the Adv of Star Schema and Snow Flake Schema?

4 Answers   Bank Of America,


There is any option to delete temp files automatically from temp directory in COGNOS? (without manual)

1 Answers   CTS, IBM,


Helow, i have a problem with runing-total function when i use it for a calculate row (for example : i need to diplay a running-total of total units ?)

0 Answers  


What is Parametermap?

2 Answers  


Categories