Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What are the End to End scenario's you are following in
your company in loadtesting or Performance testing ?

Answers were Sorted based on User's Feedback



What are the End to End scenario's you are following in your company in loadtesting or Perfor..

Answer / suhel sheikh

The normal scenario starts by selecting the scripts that
you want to run, you can run multiple scripts
simultaneously. Then select the total number of user for
which you want to run the scenario. The users are divided
equally between the scripts by default. e.g. If there are
four scripts and 100 users. The default load will be 25%
each, so 25 users for each script. You can change the load
as you want, like you can run 30% users for 2 scripts, 25%
for third and 15% for the rest. Then you need to select the
Load Generators on which you are generating the loads.
Select from the list and connect to all to make them ready.
Once you have created scenario you need to set up schedule.
Load Runner provides options to run all the Vusers
simultaneously or define a ramp up - ramp down time. Ramp
Up means you are gradually increasing the load. You specify
how many users at a specified time interval. Than in
Duration specify for how much time you want to run the
script with all the users up. The duration does NOT include
the Ramp up and Ramp down time. After defining scenario,
you are done. Just click "Run" to start execution.

Is This Answer Correct ?    3 Yes 3 No

What are the End to End scenario's you are following in your company in loadtesting or Perfor..

Answer / basava

End To End Flow is:
Non-Functional Requirement Collection: which includes the environment, server and database and some other requirements which helps to analyse the existing/new application.
Test script creation.
Work Load Design: which tells about the user distribution.
Test Execution.
Analysis of results.
Reporting/Documentation.
Conclusion of the test(any bottlenecks, performance tuning and etc).

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

how to download pdf file in loadrunner

3 Answers   Sears Holdings,


Is it possible to run Loadrunner tests in laptop? How?

3 Answers  


What are the three sections of a vuser script and what is the purpose of each one?

0 Answers  


How to configure yahoo cookies in load runner?

0 Answers  


Explain lr_output_message?

3 Answers  


What are the different components of loadrunner?

0 Answers  


How many values can be generating in script we can Parameterize even it is in one scenario 1000Parameterization values are there it is correct to Parameterized?or not?

1 Answers   Accenture,


How you will identify the Non Functional requirements?

1 Answers  


how can we test clent server application and what is the preliminary requirement for load testing

1 Answers   IBM,


how to send bottlenecks in Load runner ?

1 Answers   Wipro,


How can we capture 200 correlation value then how can handle it dyanamically.

1 Answers   Napier Healthcare,


Weblogic performance parameters, Oracle database performance parameters

2 Answers  


Categories