How capacitor bank can prove superior to synchronous condensers w.r.t. power factor correction??
3217What is the major difference between Normal control loop and Cascade control loop and when to use cascade control loop?
3431plz send me l&t auestion papers. i have been called for written and interview industrial automation 2 yrs exper. send me on mail pal_deepak06@yahoo.com
2389Why should empty compressed gas cylinders stored in upright position please describe the cause?
1 8131dear friends, pls tell me why silicone oil is used as dielectic medium in pressure transmitters
2341Post New Industrial Engineering Questions
how can we choose the controller of CNC bending machine?and how can we know the nomber of the machine axis?
start-up procedure of a centrifugal compressor
ANY ONE USED/INTERFACED CITECT VERSION 6.0/1 OR 7.0/1 TO SIEMENS S7-300 OR S7-400 CONTROLLER IF PLEASE TELL ME THE COMMUNICATION STRUCTURE AND ADDRESS CONSIDERATION FOR DI,DO,AI,AO please mail the details lok_pallapolu@yahoo.com Ph:09247513753 hyderabad
What happen if we install flow meter with orifice plate, but bevel position is in upstream and not in downstream
Dear friends, I got admit in one of the u.s university.I didnt take TOEFL and the university which i had applied have accepted IELTS instead of TOEFL.But i am worried whether the u.s visa interviewers will accept IELTS.please tell me your views about this problem and also suggest how to answer this question.If anyone had faced the same problem please E-mail and share your experience to me.I would be gratefull if you do me this help. Thankyou
what casues little rust pockets to pop through or off concrete cylinder blocks (home)?
HOW TO EVALUATE THE ACCURACY ADJUSTMENT pressure switches, given a point in switching operations or on the extent Pressure Switch
QTP related question= What is input action parameters and what is output action parameters ?
What are the uses of time standards?
What are the areas where I need to make improvement? (Please provide examples and suggestions for improvement).
Distance to be maximum distance we can install instruments from PLC panel?
reversing of each word in the string
why power contactor using in DG set's neutral which is using as a stand by load during government electricity shutdown?
Share with us about a time when you had to present a proposal to a person of higher position and were able to do it successfully?
Explain about fire hydrant and its related water pressures?