where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
1353Post New Civil Engineering Questions
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how to stop beam concrete between column
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Why should pumping be not used in case of concreting work?
what is that one cub metre plaster in cemant and fine sand
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
How did the romans get water up hills using aqua ducts?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
List out the types of roofs?
what is the water cement ratio for plastering
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
what is called the inverd level of mabhole chamber?