Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
1883How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
2413Post New Civil Engineering Questions
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
how much to get of BRC lapping in full yield and half yield ?
What is soil enforcement?
how do you stabilize a waterlogged area in road construction
How much cement and water required for cement selery????
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
In jack arch floor, the rise is kept?
in design case of structural member best suitrable percentage of steel limit is what
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What is the strongest bridge for a school contest?