Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

why building got air crack? if it get in one particular are what is means?

2455

if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

2043

Why can i adopt concreting insted of rubble solling in beds? In comoarision concreting is cheaper than the soling.

1 5049

in the footings first which reinforcement bar has to be layed as per desi

1 5486

how many bags of cement required in neat cement finish per square metre

NMDC,

3 40620

beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

Jindal,

2084

100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=

1 5178

CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

2162

What is the exception critarea of cube?

Nalco,

2526

How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?

2640

In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1970

01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.

5617

02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.

2180

03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1

2276

04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1

2044


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

2031


Explain what are the skills required to become an architect?

1163


what is pouring and explain

2351


what is the coefficient for running feet to cft coversion both area and price

2398


the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

2178


What are the different theories of failure under static load?

1301


How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete

1757


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

5216


What is bmc stands for in bmc software?

1176


insted of bentonite we can use any alternate material in piling ?

2164


what would be the design load of R.C.C Cooling tower per cell.?

2010


What are the disadvantages while using stone dust as filler in pavements?

2513


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2140


how to calculate total cost for slab 35'×8'

1924


procedure for preliminary selection of size of column of 5 storey building

3233