Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

NMN,

1 11700

Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

5108

Describe the role of independent Quantity surveyor?

2933

I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

2135

What is the acceptance criteria to determine the "Core density" of "DBM or BC" course,for any grade as per "MORTH" guidelines in road construction work ?

DBM, NCC,

2 14315

I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

2131

how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

Gammon,

2251

Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

2313

What are the Noms/8hr for Concrete Work for Mason,Carpenter,Steel Fixer

2 7011

how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30

4 10710

How much kg of sand,cement will be for 1 sqmt(Blockwork-size 400x200x200)1:4 ratio & same for plaster

2 7388

Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

2074

how calculate the ms angle weight formula detail

Concor, Puravankara,

9 77340

what is constat for brickwork

AERE,

2207

what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

L&T,

2381


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

five requirements of infill panels for walls?

3787


why we are useing plastic under the lean concrete?and whts the advantage?

2788


usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?

2212


What is the difference between Fe 500, Fe 500 D and Fe 515.

4119


What are the uses of groynes?

1176


what is the difference between prime coat and tack coat in road construction

5110


what is the use of beam end forces while using a staad ? wha they are show

3022


Special thing in designing a overhead reservoir ? which is different from an ordinary design

1271


Will water damage concrete?

1376


what is the minimum compressive strength of clay brick

2278


What are the skills required to become an architect?

1106


What is unit weight of normal concrete?

1356


how much used soil in 1 brick of standard size?

2145


how can i calculate cement in brickwork

4004


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.