English (525)
General Aptitude (3287)
Puzzles (488)
Personal Skills (0) 2 Oranges,3 bananas and 4 apples cost rs.15 . 3 Oranges 2 bananas 1 apple costs rs 10. What is the cost of 3 oranges, 3 bananas and 3 apples
TCS,
1283Aeroplane is flying at a particular angle and latitude,after some time another latitude is given..(8 hrs later), You are asked to find the local time of the place.
TCS,
1159George while driving along the highway saw road markers which are at equal distances from each other. He crosses the markers every 20 seconds. If he increases his speed by x meters per second, he crosses the markers at every 15 seconds. But if he increases his speed by y meters per second, he crosses the marker at every 10th second. If y-x = 40 meters per second, then what is the distance between two markers.
TCS,
1443How many different 9 digit numbers can be formed from the number 223355888 by re-arranging its digits so that the odd digits occupy even position?
TCS,
1338In 80 coins one coin is counterfeit what is minimum number of weighings to find out counterfeit coin
TCS,
1299In a certain city, 60% of the registered voters are congress supporters and the rest are BJP supporters. In an assembly election, if 75% of the registered congress supporters and 20% of the registered BJP supporters are expected to vote for candidate A, what percent of the registered voters are expected to vote for candidate A?
TCS,
1798In a company 30% are supervisors and 40% employees are male if 60% of supervisors are male. What is the probability that a randomly chosen employee is a male or female?
TCS,
1771One fast typist type some matter in 2hr and another slow typist type the same matter in 3hr. If both do combinedly in how much time they will finish.
TCS,
1318The crew of a rowing team of 8 members is to be chosen from 12 men (M1, M2, …., M12) and 8 women (W1, W2,…., W8), such that there are two rows, each row occupying one the two sides of the boat and that each side must have 4 members including at least one women. Further it is also known W1 and M7 must be selected for one of its sides while M2, M3 and M10 must be selected for other side. What is the number of ways in which rowing team can be arranged.
TCS,
1807
Meaning for soot:carbon, ash: ?
If Rs.1260 is divided between between A, B and C in the ratio 2:3:4, what is C's share?
Com pany C sells a line of 25 products with an average retail price of $1,200. If none of these products sells for less than $420, and exactly 10 of the products sell for less than $1,000, what is the greatest possible selling price of the most expensive product
If the % of defective balls is 10% balls,and the number of defective balls is 5.The number of balls is
Complete the series 2, 7, 24, 77,__ (hint: 2*12= 24, 7*11= 77, therefore 24*10=
if out of x bulbs y bulbs are broken;the % of non broken bulbs
If a square is formed by the diagonal of the square as an edge, what is the ratio between the area?
I need Matrix and Series questions with solutions.
A man shapes 3 cardboards in 50 minutes,how many cardboards does he shape in 5 hours? answer 18cardboards.
Himesh works thrice as much as Bhavin. Find the number of days it would take to complete the work if both work together if Himesh takes 60 days less than Bhavin to do a work.
Calculate the area of the triangle in square cm if a right angled triangle where the length of the shorter leg is one third of the length of its hypotenuse. And the length of the shorter leg is 7 cm.
A person travels 12 km in the southward direction and then travels 5km to the right and then travels 15km toward the right and finally travels 5km towards the east, how far is he from his starting place?
A sequence is given. You should find out error & write correct 1 2 5 10 13 26 29 48.
Six squares of same dimension are kept side by side to make a rectangle with a perimeter of 182 cm. what is the perimeter of each square.
A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?