You want to activate change documents functionality in order to know who changes pm order. How would you do that?
873Differentiate between equipment master and material master. On what basis do we decide which one should we create?
890You want to set warrant and partner screen in equipment master data. List the steps you will take.
895You want to remove the tasklist data marked for deletion completely from the system. What steps would you take?
969Post New SAP PM (Plant Maintenance) Questions
Can you use call horizon and shift factors in multiple counter plan?
How can you get the maintenance cost separately for labor, external services and material in a maintenance order?
Do we need to run this transaction code ip30 for all the maintenance plans which are scheduled on regularly daily basis or weekly basis so that if any scheduled object exists then it will get converted into the service order ?
What is service entry sheet? Why it is important for plant maintenance module?
Can we assign one maintenance item to more than one maintenance plan?
Which are the exact sap table and field for sap pm notification status?
Which goods movement is used to issue material with reference to a reservation triggered from a maintenance order?
We have cost center in main work center as well as in equipment master? What is the purpose of maintaining cost center at both places?
What level of functional locations should be changed for alternative labeling?
Why does settlement of a maintenance order is important?
Can we assign more than one maintenance item to a maintenance plan?
Is it possible to assign a user status to the operation and sub operation of a maintenance order?
When do you perform breakdown maintenance?
Differentiate between control keys pm02 and pm03.
What is the order type for breakdown maintenance?