You want to insert an inspection check point at the end of an operation. How would you do that?
1092Post New SAP PP (Production Planning) Questions
Where have we to specify the teardown time in one operation?
What is meant by payscale structure? How did you configure the payscale structure?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
Explain 'mrp' (material requirements planning)?
What is opening period?
What is time phased Planning?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
What is the output of mps run ?
What is Production scheduling Profile and use of it?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
Can we have more than 6 standard values in standard value key?
Why and how you calculate WIP?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
How is the processing time calculated in a wc when both labor, machine categories exist?