Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
926We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
977We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
1025Post New SAP PP (Production Planning) Questions
What is the planning horizon?
Why is work scheduling required for semi finished and finished products?
What are the three 'mrp procedures'?
You want to insert an inspection check point at the end of an operation. How would you do that?
What is the use of mrp pp evaluations?
What is the use of mrp group?
what is alternative item group
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
• How are basic order dates determined?
What is Material status and which view of the material master it is available?
What is the need of mrp list if the stock requirement list is already given?
What does the use of ms70 followed by mcec get you?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
what is the major ticket in your experience
list the important tables used in pp.