How can you get planned orders scheduled so that you can do capacity leveling ?
Where have we to specify the teardown time in one operation?
What does a PP Consultant do in his/her real time?
Mention what are the t-codes for creating, changing and summarizing bom?
Mention what are the types of master views for production and planning?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
define variable cost
Control keys
What are the three 'mrp procedures'?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
Can't one material be assigned to more than one operation in a routing, why?
What general data appears on basic data screen?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
What is the use of sap material view and list out other parameters where sap material view is applicable?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?