Design Patterns (211)
UML (234)
OOAD (384)
Software Design Tools (25)
Requirements Management (46)
Project Planning (76)
Project Management (435)
Technical Writer (10)
DevOps (119)
MVC Model View Controller (306)
Software Design AllOther (65) Can you explain the difference between vector and raster graphics? When would you use one over the other in UI design?
1 516Describe a project where you had to solve a user experience issue in a creative way. What was the challenge, and how did you approach solving it?
1 531
What is mvc dapper?
Contact a system development program in your organization. Research how they analyzed their SYSTEM OF INTEREST (SOI), its OPERATING ENVIRONMENT, and their respective system elements. How was this analysis reflected in the SOI architecture?
Explain about inheritance in oops?
What is mvc in struts framework?
What are the Quality Planning process outputs? A. Quality management plan, bench marking, checklists, evaluation criteria B. Quality management plan, bench marking, operational definitions C. Quality management plan, checklists, inputs to other processes D. Quality management plan, operational definitions, checklists, inputs to other processes
What are the most popular design patterns?
What do you mean by mvc scaffolding?
Which logical relationship does the PDM use most often? A. Start to finish B. Start to start C. Finish to finish D. Finish to start
What is the default access modifier for a class,struct and an interface declared directly with a namespace?
What is a lazy initialization in singleton?
What is difference between class and interface?
State about java and its relation to object oriented programming?
Which of the following processes are performed in the Closing process group and in what order? A. Administrative Closure then Contract Closeout B. Scope Verification then Administrative Closure C. Contract Closeout then Scope Verification D. Contract Closeout then Administrative Closure
What is url routing?
The primary function of the Closing process is to: A. Formalize lessons learned and distribute this information to project participants B. Perform audits to verify the project results against the project requirements C. Formalize project completion and disseminate this information to project participants D. Perform post-implementation audits to document project successes and failures