parallel jobs run on cluster machines. server jobs run on smp and mpp. What do mean by cluster mechines and SMP and MPP..?
3 121621)How to do error handling in datastage? 2)Did sequential stage accepts .xl files ,xml? znd how?
UHG,
2 140911)What is ur project architecture ? 2)how to move project from developement to uat? 3)What is the difference between datastage 6,7.1 and datasttage 7.5? 4).How to do error handling in datastage? 5)3.Whta is unit testing, system testing and integration testing? 6)What is the Exact difference between BASIC Transformer and NORMAL Transformer?When we will go for BASIC Or NORMAL Transformer 7)why we use third party tools in datastage? 8)What is the purpose of Debugging stages? In real time Where we will use?
6 32491create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
HCL,
2776
How can we improve the performance in datastage?
What is the difference between server job and parallel jobs?
What are stage variables?
I/p : F1 table have A,B,C,D,E and F2 table having C,E,V i need output 0utput1: ABD output2: V any one suggest me this
How can one find bugs in job sequence?
What is the difference between account and directory options ?
Hi,can any one please mention list of dimension and fact tables for Sales and Distribution System for a Pharmacutical company.
What is use Array size in datastage
What are routines in datastage?
Differentiate between datastage and informatica?
What are stage variables, derivations and constants?
How to read the length of word in unix?
What are the different layers in the information server architecture?
What are orabulk and bcp stages?
What are the primary usages of datastage tool?