Consider the following code: 77 A PIC 99V99 VALUE 55.35 77 B PIC 99V999 VALUE 32.754 ADD B TO A ON SIZE ERROR DISPLAY "ERROR!!!" What will be the result ? (a) A=88.10, B=32.754 (b) A=87.00 B=32.754 (c) A=87.10 B=32.754 (d) ERROR!!! will be DISPLAYed on the screen.
TCS,
3 12493Consider the following: 77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING C Which of the following is true ? (a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.
TCS,
4 8885A paragraph PARA-X is to be executed when none of the data names A, B and C have value of 1. Which of the following will achieve this ? (a) IF A NOT = 1 OR B NOT = 1 OR C NOT = 1 PERFORM PARA-X (B) IF NOT A= 1 AND B= 1 AND C = 1 PERFORM PARA-X (C) IF A NOT =1 IF NOT B = 1 OR C= 1 PERFORM PARA-X (C) IF A NOT = 1 AND B NOT = 1 AND C NOT = 1 PERFORM PARA-X
TCS,
3 7192Identify the invalid dataname from the following: (A) savings-account (B) annual-allocation-for-overhead (C) samount250 (D) 12demand
TCS,
4 7806Study the DATA DIVISION entries and the three PROCEDURE DIVISION entries given below: 01 END-OF-FILE-SWITCH PIC XXX. 88 NO-MORE-RECS VALUE "YES". 88 MORE-RECS VALUE "NO". (i) READ SAMPLE-FILE AT END MOVE "YES" TO NO-MORE-RECS. (ii) IF NO-MORE-RECS = "YES" GO TO LAST-PARA. (iii) IF NO-MORE-RECS GO TO LAST-PARA. Which are wrong? (a) (i) and (ii) (b) (ii) and (iii) (c) (i) and (iii) (d) all
TCS,
5 8625The following entries appear in the WORKING-STORAGE SECTION: 01 DATE-TODAY. 05 YY PIC XX VALUE "90". 05 MM PIC XX VALUE "12". 05 DD PIC XX VALUE :31". 01 DATE-EDIT PIC XX/XX/XX. MOVE DATE-TODAY TO DATE-EDIT. (a) 901231 (b) 90/12/31 (c) 31/12/90 (d) 311290
TCS,
4 8731How many bytes will be allocated for the following record description entries? 01 REC-A. 05 A PIC S9(4). 05 B PIC XXXBXXX. 05 C PIC ____9.99. 05 D PIC S9(5) COMP-3. 05 E PIC 9(3) COMP.
16 26128What is wrong with the following data declaration? 01 W-DATE PIC X(6). 05 DD PIC 99. 05 MM PIC 99. 05 YY PIC 99. (a) Nothing is wrong. (b) Under W-DATE all level 05 items are having a PIC 99 but level 01 has PIC X(6). (c) PIC can't be specified for a group item. (d) DD, MM, and YY are invalid datanames.
6 13740What is the output generated by the following code? 01 GRP-I. 05 SUBFLD1 PIC XX VALUE "AB". 05 FILTER PIC X(6) VALUE SPACES. 01 GRP-2 REDEFINED GRP-1. 05 SUB-FLD2 PIC XX. 05 SUB-FLD3 PIC XX. 05 FILTER PIC X(4). IF SUB-FLD1 NOT = SPACES DISPLAY "SUBFLD1" MOVE "ABBCCD" TO GRP-1 IF SUB-FLD3 = SPACES DISPLAY "SPACES" ELSE DISPLAY "SUBFLD3" DISPLAY "END" ELSE DISPLAY "SPACES" DISPLAY "END". (a) SUBFLD1 SUBFLD3 END (b) SPACES END (c) SUBFLD1 END (d) SUBFLD1 SPACES
TCS,
7 1052188 level entry is used for (a) data items in WORKING-STORAGE SECTION (b) items with RENAMES clause (c) condition-names (d) None of the above
TCS,
5 11165ZEROES and SPACES are _______ constants (a) Figurative (b) Numeric (c) Non-numeric (d) Alphabete
TCS,
4 9300COMPUTE X = A * B - C * D and COMPUTE X = (A * B) - (C * D) (a) Are not the same (b) Are same (c) Syntactically wrong (d) Will yield a run time error
TCS,
1 6550OCCURS clause is used in the DATA DIVISION on data names at (a) 01 level (b) 77 level (c) 88 level (d) any level from 02 to 49
TCS,
13 21299Consider the following COBOL entries: 05 X PIC 99 VALUE 10. SUBTRACT 20 FROM X. The resultant value of X wil be
TCS,
7 15932Consider the following COBOL entries 05 X PIC 99 VALUE 10. ADD 40 X TO X. COMPUTE X = 3 * X - 40. The result in X is
TCS,
12 19811
What is the latest version of ibm db2?
pls send the docs of any telecommunication mainframe project
what u mean by csrloc and rtncsrloc in rpgIV in as/400.Give an eg? to do...give some coding...what is row no and column no ???..if possible...give a no of lines coding....please
can any body give me any website for getting help on mainframe projectts in banking domain.
PLEASE SEND ME THE DOCUMENTS IF ANY ONE HAVE REGARDING THE IMPACT ANALYSYS,REVIEWS
i need a small 3d program using inline and outline.
If anyone has IBM Certification Dumps pls forward to me & also let me know what are the Certification Codes that are available in DB2
Is it rquired any server for Ibm framework? Give me list of Ibm framework & recent version IBm framework?
Are you comfortable in cobol or jcl?
List the type of locks and explain each of them.
have 3 tables table1, table2 and table3 which contains employee information. table1 is master table, table2 contains emp details like emp no and so on, table 3 contains emp salary. so if any emp leave company between 25th - 30th of every month it has to get updated in tables. but it is not getting updated. What is the reason.