IBM MainFrame (5234)
IBM AS400 (1355)
IBM PL/1 (31) Consider the following code: 77 A PIC 99V99 VALUE 55.35 77 B PIC 99V999 VALUE 32.754 ADD B TO A ON SIZE ERROR DISPLAY "ERROR!!!" What will be the result ? (a) A=88.10, B=32.754 (b) A=87.00 B=32.754 (c) A=87.10 B=32.754 (d) ERROR!!! will be DISPLAYed on the screen.
TCS,
3 12322Consider the following: 77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING C Which of the following is true ? (a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.
TCS,
4 8750A paragraph PARA-X is to be executed when none of the data names A, B and C have value of 1. Which of the following will achieve this ? (a) IF A NOT = 1 OR B NOT = 1 OR C NOT = 1 PERFORM PARA-X (B) IF NOT A= 1 AND B= 1 AND C = 1 PERFORM PARA-X (C) IF A NOT =1 IF NOT B = 1 OR C= 1 PERFORM PARA-X (C) IF A NOT = 1 AND B NOT = 1 AND C NOT = 1 PERFORM PARA-X
TCS,
3 7071Identify the invalid dataname from the following: (A) savings-account (B) annual-allocation-for-overhead (C) samount250 (D) 12demand
TCS,
4 7660Study the DATA DIVISION entries and the three PROCEDURE DIVISION entries given below: 01 END-OF-FILE-SWITCH PIC XXX. 88 NO-MORE-RECS VALUE "YES". 88 MORE-RECS VALUE "NO". (i) READ SAMPLE-FILE AT END MOVE "YES" TO NO-MORE-RECS. (ii) IF NO-MORE-RECS = "YES" GO TO LAST-PARA. (iii) IF NO-MORE-RECS GO TO LAST-PARA. Which are wrong? (a) (i) and (ii) (b) (ii) and (iii) (c) (i) and (iii) (d) all
TCS,
5 8459The following entries appear in the WORKING-STORAGE SECTION: 01 DATE-TODAY. 05 YY PIC XX VALUE "90". 05 MM PIC XX VALUE "12". 05 DD PIC XX VALUE :31". 01 DATE-EDIT PIC XX/XX/XX. MOVE DATE-TODAY TO DATE-EDIT. (a) 901231 (b) 90/12/31 (c) 31/12/90 (d) 311290
TCS,
4 8582How many bytes will be allocated for the following record description entries? 01 REC-A. 05 A PIC S9(4). 05 B PIC XXXBXXX. 05 C PIC ____9.99. 05 D PIC S9(5) COMP-3. 05 E PIC 9(3) COMP.
16 25617What is wrong with the following data declaration? 01 W-DATE PIC X(6). 05 DD PIC 99. 05 MM PIC 99. 05 YY PIC 99. (a) Nothing is wrong. (b) Under W-DATE all level 05 items are having a PIC 99 but level 01 has PIC X(6). (c) PIC can't be specified for a group item. (d) DD, MM, and YY are invalid datanames.
6 13542What is the output generated by the following code? 01 GRP-I. 05 SUBFLD1 PIC XX VALUE "AB". 05 FILTER PIC X(6) VALUE SPACES. 01 GRP-2 REDEFINED GRP-1. 05 SUB-FLD2 PIC XX. 05 SUB-FLD3 PIC XX. 05 FILTER PIC X(4). IF SUB-FLD1 NOT = SPACES DISPLAY "SUBFLD1" MOVE "ABBCCD" TO GRP-1 IF SUB-FLD3 = SPACES DISPLAY "SPACES" ELSE DISPLAY "SUBFLD3" DISPLAY "END" ELSE DISPLAY "SPACES" DISPLAY "END". (a) SUBFLD1 SUBFLD3 END (b) SPACES END (c) SUBFLD1 END (d) SUBFLD1 SPACES
TCS,
7 1028188 level entry is used for (a) data items in WORKING-STORAGE SECTION (b) items with RENAMES clause (c) condition-names (d) None of the above
TCS,
5 10922ZEROES and SPACES are _______ constants (a) Figurative (b) Numeric (c) Non-numeric (d) Alphabete
TCS,
4 9194COMPUTE X = A * B - C * D and COMPUTE X = (A * B) - (C * D) (a) Are not the same (b) Are same (c) Syntactically wrong (d) Will yield a run time error
TCS,
1 6481OCCURS clause is used in the DATA DIVISION on data names at (a) 01 level (b) 77 level (c) 88 level (d) any level from 02 to 49
TCS,
13 20850Consider the following COBOL entries: 05 X PIC 99 VALUE 10. SUBTRACT 20 FROM X. The resultant value of X wil be
TCS,
7 15658Consider the following COBOL entries 05 X PIC 99 VALUE 10. ADD 40 X TO X. COMPUTE X = 3 * X - 40. The result in X is
TCS,
12 19395
what is use of space parameter in dd statement?
What do you mean by rollback?
What is the main function of linear dataset?
How to resolve deadlock issue
What is ook-rec?
Explain how do you terminate an already issued delay command?
how we sort two input files based on a common column and giving one o/p file please send me the coding logic?
what is the difference between COBOL2 AND COBOL390?
what is the meaning of each of the values in shareopts(2 3)?
Differentiate between structured cobol programming and object-oriented cobol programming.
So manual and automatic are the connect options for a set. What are the disconnect options?
can we define multi-dimensional arrays in rpg ?
How can you validate Sql errors during cursor operation in db2 pgms and where do you code?
Is the order of the when clause significant in an evaluate statement?
What is the quality process in development?