Why do we need break and continue in python?
A character flag or control mechanism that delineates one data item from another a) variable b) constant c) delimiter d) call by reference
What happens to each of the three primary financial statements when you change a) gross margin b) capital expenditures c) any other change?
Can you use php and javascript together?
What makes a molecule into an organic molecule?
Do you know mutation testing?
Tell me the use of bit field in c language?
Can you summarize the steps I have to go through in writing my first cgi?
Compare a hierarchical and network database model?
2. Dry saturated steam at 3.5 bar is expanded through a convergent nozzle to 2.2 bar. The exit area is 5 sq. cm. Calculate the exit velocity and mass flow rate, assuming isentropic expansion and super saturated flow. b) A cast iron cylinder head is fastened to a cylinder of 750mm bore with 12 stud bolts. The maximum pressure inside the cylinder is 3 Mpa. The stiffness of part is thrice the stiffness of the bolt. What should be the initial tightening load so that the point is leak proof at maximum pressure? Also choose a suitable bolt for the above application 2 The propeller shaft of a marine engine is to transmit 600 kW at 1200 rpm, without a significant bending. The efficiency of the propeller is 88% at 32 knots ( 1 knot = 1085 km/hr). If the slenderness ratio is less than 50 and the permissible shear stress should not exceed 65 Mpa. Determine the diameter of shaft. 3 A semi-elliptic leaf spring consists of two extra full-length leaves and six graduated length leaves, including the master leaf. Each leaf is 7.2 mm thick and 65 mm wide. The centre-to-centre distance between the two eyes is 1.3m. The leaves are pre-stressed in such a way that when the load is maximum, stress induced in all leaves are equal to 380 N/mm sq. Determine the maximum force that the spring can withstand
What are the types of the programming language used in the sap abap software?
What kind of mvc is struts 2?
What is ms word components?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What version of windows do I have 32 or 64 bit?