how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculation
34 690572Post New RPP Civil Engineering Interview Questions
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
What is the use of keygen in html5?
What are all the classes and interfaces that are available in the collections?
What is the standard size of font?
What is the maximum size of string data type supported by Hive?
What is mvc mvp mvvm?
Can django replace javascript?
How to connect to vpc in different regions?
Explain what is injector in angularjs?
How do I add a website to iis manager?
what is the difference b/w pvc cu conductor and cu breaded wire..?
How do I disconnect outlook?
How can you build and test a metric to compare ranked list of TV shows or Movies for two Netflix users?
Explain worm feeds itself by sucking the blood of animals and humans.after feeding, the worm becomes fat and falls off?
Explain why it is useful to use mvc instead of webforms? : asp.net mvc