What is the significance of xml-based layouts?
Can two ip addresses use same port?
What is the reason for emitting the white exhaust smoke during start of the vehicle?
What is code access security (cas)?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
What are pointers? What are stacks and queues?
How can you prevent overfitting in neural networks?
What should be done to override the governor limit that restricts you from fetching more than 50,000 records in a soql query ?
Where can we implement the dom manipulation in angularjs?
What is difference between array and arraylist in c#?
Explain life cycle of asp page.
How to rename an existing column with the "sp_rename" stored procedure in ms sql server?
What is the newest version of html?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
how do I identify the network interfaces on my server?