Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

Khas Pvt Ltd Interview Questions
Questions Answers Views Company eMail

WE ARE HAVING YOKOGAWA CENTUM CS 3000 DCS, 2 FCS AND 4 HIS " When the operation Download to HIS message appears: Equalize start. HIS0163 WARNING: Could not connect to equalize destination. (7001) Retrying. Number of retries = 0/1 ERROR: LdXopsLoadMain: connect error 10060 ERROR: LdXopsLoadMain: connect error 10060 ERROR: Processing terminated due to connection error. (7002) Equalization end with errors. HIS0163 ---- ERROR = 3 WARNING = 1 ---- Tell me, please, why and how to solve the problem."

6 25764

Post New Khas Pvt Ltd Interview Questions


Khas Pvt Ltd Interview Questions


Un-Answered Questions

How does the sale help consumers to increase their awareness?

1058


Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =

1933


What is the function of the dd mgmtclas keyword in sms datasets?

1222


How to execute more than one sub jobs parallel in talend

1


What are helpers in codeigniter?

590


What do you understand by Trust Flow?

850


What is interceptors in angularjs?

776


When was the indian made rocket “ rohini ” launched from thumba?

1123


Which is better jsp or php?

884


Is excel a data analysis tool?

752


What is window application in c#?

941


What is difference between throughput and data rate?

925


What is vldb(very large databases)?

1002


What is Split-Join?

553


What is the role of viewer in wordpress?

161