how the CT and PT is connected in the circuit during testing of transformer explain with diagram
2011What is the maximum allowed kwa through 2.5mm cable. Electric company installed 2 electric meter at my premises . Two jumper wires of 2.5 mm are used to connect . 2 single phase meters with allowable load 6 and 3 kwa. These jumper wires are taken from a 3 phase electric meter. Meters are in open Sun. What max load these wires can take.
2162Post New KESC Electrical Engineering Interview Questions
What is af_inet in socket?
Explain what are the major data structures used in the network data model?
How many database servers does facebook have?
How do you change a dimension value in solidsworks?
what is the difference between nested subquery and correlated subquery?
how do you test your message flows and design test case?
How to set a custom CVS PServer port?
How is the item text copied from sales order to delivery?
How to open a new test using quicktest professional (qtp)?
Which container method is used to cause a container to be laid out and redisplayed?
Step 1 RC 4 Step 2 Step 3 I want to know the COND parameter which can be coded in step 2 or 3. Step 2 should be executed based on Step 1 RC and Step 3 should not be executed based on step 1's RC
When do you have to avoid secondary indexes?
Explain how does flowchart help in writing a program?
Explain how do you debug an asp.net web application?
what is the Casualty Actuarial Society?