A power unit is there by the bank of the river of 900 mtr width. a cable is made from power unit to power a plant opposite to that of the river and 3000 mtr away from the power unit. The cost of the cable bellows water Rs5 / mtr and cost of cable on the bank is Rs 4/ mtr. Find the total of laying the cable.
6 224291) after inserting the check point how to change the expected value that was captured while inserting the check point
2 4862Post New TCS Interview Questions
Distinguish between cognos dynamic cube and transformer/tm1 cube and powerplay cube?
Can you explain the importance of finalize method in .net?
Explain the term ‘relations’?
What is the use of splunk alert?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Explain the work of ctrl+alt+del key combination on the linux operating system?
How to get hibernate session in spring boot?
What is server in simple words?
Can I uninstall iis 10.0 express?
What is PDV?
my bachelors was done with EEE now i got admit in NU with CS as course. how to answer this qns 1) why u choose cs? 2) why u changed from eee to cs
Which is the default, TEST BEFORE or TEST AFTER for a PERFORM statement?
why we are using stub column..? is it possible to construct steel stub column..?
Is java an assembly language?
How global cursor can be declare with dynamic trigger ?