1. what type of winding of slip ring ac induction motor rotor and why. 2. how the heating element use in two phase (415 volt)and what rating of element, you prefered.
1 4941MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)
2441Post New Simbhaoli Sugars Interview Questions
Tell About ur self what will i say plz help me
What is a Pivot?
Why does couchdb not use mnesia?
Is internal hard disk repairable?
What is xslt template?
Are null values the same as that of zero or a blank space?
how can we calculate the ratio of caustic soda and water in lrs.
Implement the following methods: retain, release, auto release in iOS operating system?
What is system windows forms dll?
Do you know how to get the ip address of the client?
What is pre-requisites for contributing to apache mahout ?
What are the two modes of views in selenium ide?
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
What advance thing in php7?
How do I create an xml map in excel?