State the cause of error for insufficient privilege access in a partner community with external users. The user has proper owd and profile settings for any object.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What are the available Alternate security databases ?
In term of banking what do you mean by labs?
Why xml is a markup language?
How do I use outlook with gmail?
What is the final access modifier in java?
What is a text delimiter?
What is meant by an AICA ABEND?
What is metadata in angular?
What is assembly condition codes?
Can you explain apache ambari?
What is Reflection in .NET? Namespace? How will you load an assembly which is not referenced by current assembly?
Have you ever been charged with training and coaching other sales professionals?
What is event bubbling?