Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

NIC Interview Questions
Questions Answers Views Company eMail

The moment of inertia of an area is always least with respect to ?

801

acetylene is stored in ?

596

When a spring is cut into two, stiffness becomes ?

594

Explain the purpose of riser?

618

On what Purpose helical gears are used?

608

What is the specific speed of a pump ?

625

carnot cycle has maximum efficiency for ?

641

What is the use of damper?

611

What type of grinding is used for harder materials?

571

The Hardness of wheel(or)grade of wheel refers to the

629

Water hammer in pipes occur due to ?

658

What is the most ductile metal?

636

The stress concentration is caused due to ?

724

The hardness of steel depends on

616

In welding, arc is too long due to ?

604

Post New NIC Interview Questions


NIC Interview Questions


Un-Answered Questions

What is the shortcut key to refresh laptop?

504


Explain posting of costs to cost centers? : co- cost center accounting

669


How do you identify a different wage types?

534


Explain the automatic dialer? : insurance cold calling

332


What mrp (material requirement planning) list is and what is the transaction code to access mrp list?

685






What Is Loan Management System?

666


Briefly explain thrashing.

615


What do you understand by fuel cycle in nuclear plants ?

627


You are project manager for an engineering company. Your company won the bid to add ramp-metering lights to several on-ramps along a stretch of highway at the south end of the city. You subcontracted a portion of the project to another company. The subcontractor's work involves digging the holes and setting the lamp poles in concrete. The subcontractor's performance is not meeting the contract requirements. All of the following are valid options except: A. You document the poor performance in written form and send the correspondence to the subcontractor change request through Contract Administration. B. You terminate the contract for poor performance and submit a change request through Contract Administration. C. You submit a change request through Contract Administration to ask the subcontractor to comply with the terms of the contract. D. You agree to meet with the subcontractor to see if a satisfactory solution can be reached.

572


How long does disk check take?

488


Once an application has been submitted, can I make changes to my submission?

557


Explain MVC model binders?

599


HOW CAN WINRUNNER AND TEST DIRECTOR CONNECTED TO THE DATABASE AND WHAT R THE OPTIONS?

1466


What is inner join in sql?

586


ROC converges if pole and zero lies inside a) origin b) z=1 c) pole d) zero ? Explanation please? if ROC does not converges then?

2465