At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
1825What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
1957Post New Kirloskar Civil Engineering Interview Questions
Why should you use azure cdn?
What is the difference between the test plan and test strategy
I need to learn everything I can about what a Waterfall approach vs. an Agile approach looks like in QA Testing. What is the best online resource?
How do I simulate optional parameters to com calls?
Can we Put "TAX INVOICE" in the sale in Transit (E1) Invoice.
Give a definition of plant (in sap).
Imagine that there is one sender and three receivers. While sending an idoc, how many idocs would be generated? Explain the flow from outbound to inbound system.
what is use of communication wire in multipare cable(oil and gas field), why this communication wire not used in single pair cable?
What if the project isn’t big enough to justify extensive testing?
hi all, I need the SAS DI DUMP(A00 260) for attending the certification. if any one have, pls provide it.Please Email to vrpotluri@hotmail.com. Thanks - Ramana
What is the difference between static or dynamic assemblies?
What purpose does the SRM org structure serve?
How Mapper is instantiated in a running job?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the differentiate between bounce rate and exit rate in seo?