deference between DCS and PLC including date processing and architacture.

11 16913

How did you spent your last day,sunday,?

66 431901

sir please send me previous year questions of jspl through which i could prepare myself fpr the test.

64 54514

In a thermal power plant : Why the Deaerator is placed at height and mostly at 15.5mtr?

9 38225

WHAT HAPPENS IN DIFFERENTIAL PROTECTION IF CT REACHES ITS KNEE VOLTAGE POINT?

4 9422

sir,i had a written test conducted by jindal steel and power ltd .so please forward me the type of questions asked in written test (technical)

1601

Pls send me the 10 years technical question paper of Jindal steel power to my email id

12 15780

pls ,send me technical questions of jindal steels and power ltd

1752

What are your short and long term goals?

1703

plz sent me jindal placement papers in mechanical enginnering

2344

i have want jindal written aptitude test paper.

2 5379

How to calculate the transmission losses incase of overhead transmission lines?

6 11535

how 2 prepae for technical aptitude? suggest me any books r

4705

what is the highest transmission voltage in india???

49 47541

WHAT IS BIFR? GIVE THE DETAIL EXPLANATION

2 25272

Post New Jindal Interview Questions




Un-Answered Questions

You are a project manager for Picture Shades, Inc. They manufacture window shades for hotel chains that have replicas of Renaissance-era paintings on the inside of the shades. Picture Shades is taking their product to the home market, and you're managing the new project. They will offer their products at retail stores as well as on their website. You're developing the project schedule for this undertaking and have determined the critical path. Which of the following is true? A. You calculated the most likely start date and most likely finish dates, float time, and weighted average estimates. B. You calculated the activity dependency, and the optimistic and pessimistic activity duration estimates. C. You calculated the early and late start dates, early and late finish dates, and float times for all activities. D. You calculated the optimistic, pessimistic, and most likely duration times and the float times for all activities.

1065


How do I use comments within a jsp page?

550


What is the docu.flow?

804


How I can evaluate the internal control audit?

739


Can a phone run windows 10?

431






What are prompted filters? Have you ever used them? Where?

566


Can I install 64 bit windows on my pc?

467


What is shared memory in os?

622


What is the use of global variable $ in Ruby?

3


What is an implicit object?

473


What is ldap realm support and why would I want to use it?

473


What you can do to remove data from the cache and query plans from memory for testing the performance of a query repeatedly?

596


Why is .net so popular?

536


Draw Sequence Modal of RDO and Explain?

1879


When was hibernate first released?

209