What is interaction or interface bet PP with FICO and PP with SD
Answers were Sorted based on User's Feedback
Answer / klmcsc
For pp and fico interaction
product costing,cost roll up,
Is This Answer Correct ? | 14 Yes | 3 No |
Answer / mohan r. desai
Dear Readers,
First of all let me make it very clear. The question should
have been What is the integration between PP & FICO and PP
& SD.
The integration of PP with FICO is related or integrated in
more than one way. There will be Profit Center. There will
be Cost Center for each Work Center. When we refer as a
Profit Center all the revenues get booked against the
profit center and all the costs get booked in the Cost
Center with the Costing Element.
The integration of PP and SD starts with the creation of a
Sales Order. Production Planning starts after the Sales
Order creation.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / freejo
Integration with PP-SD is the
requirement class and the requirement type. These are
defined in the Planning startergy of PP and Requirement
type of SD. Additionally the SCh lines also play a major
role.
Is This Answer Correct ? | 9 Yes | 6 No |
Answer / amit
PP with FICO is mainly concerned with cost center where all
the costs of PP like variances , activity costs are
captures via cost center and mainly used for product
costing.
PP with SD is mainly concerned with requirements of the
sales order to define with production/process order . It is
defined in detail in customizing with Requirement classes
where sales order relates the right procedure w.r.t.
production.
Is This Answer Correct ? | 3 Yes | 2 No |
What does the use of ms70 followed by mcec get you?
What is the use of infogroups?
What is Schedule Margin key. How floats works in scheduling?
When will the order fully settlement?
a company needs 12 standard values. how it can be maintained?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
what is consignment?
Explain what is the meaning of exploding a bom?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
How costing is affected the pp?
How can you create production order without routing and BoM?
What are the lot size you have used?