what is difference between group BOM and BOM group ?
Answers were Sorted based on User's Feedback
Answer / mukesh bafana
A bill of material that is not assigned to a plant.
A group BOM is valid across the entire company.
Special features of group BOMS:
A plant check is not carried out for the materials in a
group BOM.
A group BOM is not exploded in material requirements
planning and in the production order.
Group bills of material are mainly created in the design
phase and then later assigned to one or more plants for
production.
A collection of bills of material that lets you describe a
product or a number of similar products.
The following bills of material comprise a BOM group:
All the variants of a variant BOM
All the alternatives of a multiple BOM
Is This Answer Correct ? | 30 Yes | 3 No |
Answer / alapini kasture
BOM Group:
A collection of bills of material that lets you describe a
product or a number of similar products.
The following bills of material comprise a BOM group:
All the variants of a variant BOM
All the alternatives of a multiple BOM
Group BOM:
A bill of material that is not assigned to a plant.
A group BOM is valid across the entire company.
Special features of group BOMS:
A plant check is not carried out for the materials in a
group BOM.
A group BOM is not exploded in material requirements
planning and in the production order.
Group bills of material are mainly created in the design
phase and then later assigned to one or more plants for
production
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / zaheer
group BOM is created during R&D stage, whcih does not have
any impact in material allocation agaist order. Also not
considered by MRP.
BOM group is a catogorizatoin of BOM's similar to the
classification of materials. for ex. Variants BOM's
Alternate BOM's.
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / prabhu
Group BOM: BOM with out plant which is in the development stage.
BOM Group:Standard BOM with referance to plant
Is This Answer Correct ? | 1 Yes | 3 No |
Answer / javed naseer
Group BOM:- Group BOM is a type of B.O.M like simple B.O.M,
Variant B.O.M, Multiple B.O.M.
It is made without reference of any plant after creating
it, we can assign it any number of plants but in this case
internal number of B.O.M will remain same & also any change
to main bom will effect every bom where they are assigned,
but if we will make any b.o.m from this group B.O.M by copy
through than internal number will be change & in this case
change in main bom will not effect other bom.
B.O.M Group:- When we create a B.O.M a bom group is given
Is This Answer Correct ? | 4 Yes | 15 No |
In project the customization is comes under which phase?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Difference b/w Co-product & by-Product
If the scenario is''Party is supplying some material we have to do the some processing operation on it, how it cab be handled in SAP"
what is varient BOM?
What is plm (product lifecycle management) in sap pp?
Mention what is the production process in sap?
What is availability check? How can it be done?
What is batch management
How are time management and payroll are integrated?
What are the parameters are there in Order type or in dependent para. config?
Why the work scheduling view is required for semi-finished and finished products?