What is CR (change Request) & how it is working? what are
stpes?
Answers were Sorted based on User's Feedback
Answer / pavanbala
Change Request comes from the user in support project, After
implementation user wants some thing to be added or modify
to the existing configuration in SAP,
Before doing CR the consultant must make analysis on CR the
effects on existing process and before doing CR consultant
must be get approval from the authorities.
Is This Answer Correct ? | 35 Yes | 0 No |
Answer / rabindra s
Change Request comes in support phase of a project after
implementation, any kind of change in the existing process
or any improvement or any type of change as per the user
request.
It may include ABAP change,or sometime configuration change
in both the cases functional consultant have to do the
feasiblity study and impact of change to the existing
process flow and act accordingly.
Change Request can be maintain in SAP solution manager if
you have configuration in your project.
Regarding the process step, yes it has proper approval
process,but again that depends on your organisation setting
and level of approvers.
in my project a CR must be approved from
1. Requestor of the CR
2. BPO of the Module say MM
3. CEO of the company.
After only when you received the duely singed CR, you are
allowed to move the changes means CR contained to
Production system.
and one morething i like to add is that CR is alwasy
created for major changes in the system,else generally
support message are created for minor modification.
Thank you Rabindra MM Consultant
Is This Answer Correct ? | 14 Yes | 2 No |
Under which business scenario split valuation is used?
Is it possible to have a release procedure without classification for a PO?
What big changes does this upgrade bring?
What is Purchase Requisition means? Why we used this in MM Module in SAP? what is t.code of it?
Which documents are generated in migo 101 movement type? Which accounts are effected in the process?
What is Diffrance Between Batch No. & Serial No.
Which facility of sap will you use if you want to maintain different moving price of a material based on its origin? For ex: there is a motor if purchased from a domestic vendor or if purchased from a overseas vendor. How will you maintain different moving average price for both cases.
How is the inventory management integrated with mm?
Can we defined release strategy Dept wise with MM HR integration ? and how?
Howmany stock transport order's avaiable in sap system. and how to configure stock transport order's?
Q. What is GR blocked stock? When it can be used? Q. How do you plan for a vendor rating system and move about? Q. How do you make variants? Q. How to inventory excise duty in SAP? Q. What is meant by consignment stock? Q. What are the steps in automatic account assignment configuration? Q. Tell me about the subcontracting cycle. Q. What is meant by batches? How can the batches be searched? Q. What is meant by MRP Type and lot sizing? Q. Is it possible to have scales in a quotation? Q. How are the variations in subcontracting taken care of in SAP? Q. How is an item with serial no. managed? Q. What are the types of tables in SAP? Q. What are the documents generated in the MIGO 101 movement type? What are the accounts hit? Q. Can it be configured in such a way that the external requisitions can also be taken into account while MRP runs in consumption-based planning if VB is selected as MRP type? Q. Can anyone give an overview on Account Determination? Q. WHAT R ALL THE LEVELS INFORECORDS R MAINTAINING? Q. What is difference between "terms of payment" and "payment terms" Fields are available in vendor master purchasing view and accounting view respectively. System can take two different values for same vendor? Why different values are maintained? Q. Can any one explain the following in length ACCOUNT MODIFIERS, SPLIT VALUATION, VARIANCES, TRANSACTION EVENT KEY? Explanation with an example would help me a lot. Q. A P.O has 50 items all the 50 items have the same price. Instead of entering the price for each item 50 times is there any option in SAP where the common price can be entered in one go? Q. Can anyone describe the batch management process? Q. What are the steps involved in creating a pricing procedure? Q. How is scrap accounted in subcontracting? Q. How does the system calculate taxes? Q. What is meant by MRP Type and lot sizing? Q. What is a reference purchase organization? When can it be used? Q. Explain the concept of split valuation and when can it be used? What are the settings required? Q. What are valuation area, valuation category and valuation class? Q. What is meant by a credit memo? Q. What is meant by a release strategy? Q. What are the tools available for data migration in SAP? Q. What is LSMW? Q. What is the difference between LSMW and CATT? Q. How do you plan for a vendor rating system and move about? Q. I am doing sap mm, i have a question, do consultants copy n save from sap std.1000 in real time too? Q. What is float purchase organization? Q. How many finance documents will system generates when goods receipt from subcontracting made? Q. How we create a new material type and how to assign G/L account to it? Q. How we will differentiate a STO and a standard purchase order with a glance? Q. What is the difference between BSX and BSA? Q. If suppose i m giving sample to store to quality and after one day this stock is unrestricted then quality people wants take another sample on same material suppose stock was 100 kg n in quality i was giving them 1 kg then after a day 99 kg was unrestricted ok, then they decided wants to need another sample 1 kg then what i m doing so pls tell me with transaction code??? Q. How to give another test sample to quality on same material after few days? Please tell me with transaction code???? Q. How a support individual will receive Tickets/issues from client? Q. wht is the diff between partner function and partner type? Q. wht is the use of account modifier in automatic account determination? Q. in stock detrmination.wht is header table and item table? Q. whr in inforecord you can see the quantum price? Q. What is Diffrance Between Batch No. & Serial No.
In your up gradation project 4.6B version to ECC6.0 what differences observed in SAP MM explain