Anyone have sample questions for bhel please send me since
Iam appearing for this exam.
Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
Answer Posted / ratnakar maurya
hi renu i also want this paper,
if you will get it then pls send it to
ratnakar_maurya@rediffmail.com,ratnakar.maurya@gmil.com.
thanks
RATNAKAR MAURYA
L&T LTD.
9772218175
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
is basic cost of the material includes tax?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
I need old MMUP exam question and answer for Civil engineering
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
what is the difference b/w full length and cutting length?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is civil all interview questions
how to do sudoko puzaals?
how much one carpenter can doing shuttering of slab in one day
what is detail procedure of eccentric footing? plz. give solved exmple?