How to connect TestDirector from winrunner tool?
Answer Posted / ashok
Hi,
Before to connect the Winnrunner to TD,
1.Create a Script
2.execute the script through Verify
Mode.
3.After Execution incase the script having a fail status in
Test Resule window.
Then we can connect the W/R to TD
Path - Tools - Connect to test Director
=====
As per your Question, if you got the Error like - WR cann't
identify the Object means - you didn't save the script
(Physical Desc.. and class in GUI Map.)
Note:
Once you create a Script immidiately save the related
things in Global GUI Map or GUI map per Test.
Ashok (any doupt plz make a mail -
ashoksr_win1975@yahoo.com.sg)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do you identify which files are loaded in the gui map?
What is the use of gui map and what happens when gui map file get loaded?
Can anybody Explain me about the liasing with the developers,and a tester can make a test plan well?plz explain me as soon as possible ,thanx in advance.
Explain the purpose of gui map configuration?
What actually happens when you load GUI map?
What do you verify with the database check point custom and what command it generates, explain syntax?
What is the purpose of gui map configuration?
How do you make the configuration and mappings permanent?
How do you select multiple objects during merging the files?
What are the platforms that WinRunner can be used?
How do you handle dynamically changing area of the window in the bitmap checkpoints?
supose 10 times text data is there but it will run 8 times whtat will you do.
what is risk?
How you integrated your automated scripts from TestDirector?
i would like to know the steps to write tsl exception and object exception with a simple example