Given the following code, what is the value of RESULT?
DName+++++++++++ETDsFrom+++To/L+++IDc.Keywords+++++++++++++
D RESULT S 5 0
C EVAL RESULT = (2 + 3 * 2) ** 2 / 2
Answer Posted / anuj
Agreed.. Should be 32.. see below
1. RESULT = (2 + 3 * 2) ** 2 / 2
2. RESULT = (8) ** 2 / 2
3. RESULT = 64 / 2 = 32.
Thanks.
| Is This Answer Correct ? | 18 Yes | 0 No |
Post New Answer View All Answers
what is data area and how it is used in rpg program ?
what is the use of sflnxtchg?
1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.
how do I declare a table or array in rpg iv?
give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........
what is a rpg?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
how do you use commitment control in rpg?
Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?
how do I declare a minor?
What is the difference between copybooks and subprocedures in as400?
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
what is the necessary keyword needed to scroll subfile records?
Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg
When it is desirable to describe files Internally?