what are the basic parameters considered in designing a
pavement?
Answer Posted / dev
thicness of pavement(traffic intensity,max wheel load
etc.),no. of layers
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How to calculate brick work quantity?? Block work quantity??
How much of the strength of concrete comes from post- production curing?
How many square meter can a worker/labor demolish a structure per day?
What is the sugested procedure of water purification for public supply?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
what is anchorage length,lap length and (dont remember the last one)
2. What are the advantages of your present job, things you like about it?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what are the layers of the national and heir aprox thickness??
Are cruise ships built for the transatlantic run?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
Why should pumping be not used in case of concreting works?
Explain what are the problems one might face while having a Cantilever balcony?
Why joints are provided?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)