Answer Posted / sakthi
Resource
master recipe
material master
process order / production order creation, confirmation
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Define mrp controller
Where we have to specify the teardown time in one operation?
Have you used Pull list or back flushing in REM?
What is Individual and collective requirements and differecne between them in MTO scenario?
What is Inspection Points?
Difference between different strategy groups.
What is SOP and types of SOP?
What is the SPRO Path for requirement class and req. type?
How to group employees for their allowances in payroll?
In sap-pp what are the costing parameters?
Explain variant configuration
What is MTS and MTO and the difference between them?
Difference between Item categories or what is variable size item or non stock item.
Explain schedule margin key
In lsmw which is the most important step?