Answer Posted / sakthi
Resource
master recipe
material master
process order / production order creation, confirmation
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is detail scheduling
How the process time is calculated in a wc when both labour, machine categories exist?
What is mrp list and what is the use of it?
What is activity type and how it works in costing?
What is the use of infogroups?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Explain why their is need of production version ?
What is MRP Area or How can I excluede one storage location stock from MRP?
Mention what is the use of t-code cs20 in bom?
What is MRP procedure
Which MRP types you have used?
What is a ‘work center’ in pp?
What is recursive BOM
What are basic dates?
Mention what are the keyfields found in mrp view 1?