HOE DO U IMPLIMENT SCHEDULING IN INFORMATICA?
Answer Posted / rajan
Informatica has own Sheduling components .Since Informatica
widely used as Data integration and Data warehousing Entity
and there are lots of depedencies on other jobs ,reason
informat application is scheduled by external sheduluing
device such as
1) Control M
2) Crontab
3) maestro
Basic Functionlity behind scheduling is PMCMD cmd thro
shell scripts they trigger informatica jobs via pmcmd
command.
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
What is the main purpose of Unconnected lookup other than updating slowly changing dimensions? or In which case u use Unconnected lookup?
My source is delimited flat file Flat file data is H|Date D1|ravi|bangalore D2|raju|pune T|4 The data will be send to target if the fallowing two conditions satisfied 1.The first row Date column is equal to SYSDATE 2.Last record second port equal to number of records. How to achieve?
Implementation methodology
How do you manage the Parameter files while migrating your data from one environment to another environment?
Why update strategy and union transformations are active?
What are the differences between source qualifier and joiner transformation?
I am not able to connect to the domain with the client although all services and databases are up and there is no network issue?
How to use pmcmd utility command?
What are the tasks that can be performed using sq?
What is the need for an etl tool?
What do you understand by a term domain?
What is the difference between informatica 7.0 and 8.0?
Hello, Can you please send the admin and advanced mapping design sample questions to ns_sharmin@yahoo.com?
How to extract the informatica rejected data?
whats the logic to load the lower level of granularity of data to fact table.