What is interaction or interface bet PP with FICO and PP with SD
Answer Posted / freejo
Integration with PP-SD is the
requirement class and the requirement type. These are
defined in the Planning startergy of PP and Requirement
type of SD. Additionally the SCh lines also play a major
role.
| Is This Answer Correct ? | 9 Yes | 6 No |
Post New Answer View All Answers
What is collective order. Pre requisite of the collective order?
What happens to plan after it has been converted into production order?
What are the production process in sap?
What is SOP and types of SOP?
How is the processing time calculated in a wc when both labor, machine categories exist?
Control keys
Mention what is the purpose of using capacity planning?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What are the ‘bom categories’ supported by sap?
What are traffic lights in mrp?
You want to integrate pp with fico. What steps would you take?
what are the constraints of Variant configuration?
Difference between plan cost, Actual cost and target cost.
What do you do to run MRP for just one MRP Controller?
Mention what is the use of t-code cs20 in bom?