What is interaction or interface bet PP with FICO and PP with SD
Answer Posted / freejo
Integration with PP-SD is the
requirement class and the requirement type. These are
defined in the Planning startergy of PP and Requirement
type of SD. Additionally the SCh lines also play a major
role.
Is This Answer Correct ? | 9 Yes | 6 No |
Post New Answer View All Answers
Which MRP types you have used?
What is mrp controller means?
What is the planning time fence?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is collective order. Pre requisite of the collective order?
What is Auto GR?
What is the difference between stock transport order and stock transfer order?
Explain In-process inspection.
a company needs 12 standard values. how it can be maintained?
Explain what is the need of mrp list if the stock requirement list is already given?
Special Procurement type 40 – proc. form alt. plant
Where have we to specify the teardown time in one operation?
What is the use of sap material view and list out other parameters where sap material view is applicable?
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is the use of stock requirement list?