Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the different types of pile founations used?

Answer Posted / sindhu

pile foundations:Based on
* material used-steel,concrete,timber,composite
[(steel+concrete)or(timber+concrete)]
*mode of load transfer-end bearing,friction and combined
*installation-driven,bored,screw,jacked
*use-tension,fender,anchor,compaction,load bearing etc....
*displacement of soil-displacement, non-displacement

Is This Answer Correct ?    25 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain moment of inertia and its importance.

1181


Define graphics window?

1127


What is fineness modulus ? and its sieve # ?

1294


what is pqc

1716


what is the difference between replacement of cement by groundnut shell ash

3116


questions with answers to face an interview of an civil engineer regarding RCC buidings

2583


how to calculate quantity of bricks in circular manhole with examples.

5590


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

1986


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2395


How to get MEP technical,instaaltion & testing data for interview?

2079


What is the exception critarea of cube?

2479


How is make concrete cube?

1150


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1980


how to calculate the chair reinforcement length in slabs, footing or anywhere??

2331


i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available

1872