Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the difference between C-Curve and D-Curve for
MCB's.

Answer Posted / ismail

C CURVE USED IN INDUSTIAL APPLICATION AND D CURVE USED IN
DOUMASTICK APPLICATION

Is This Answer Correct ?    34 Yes 433 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?

2086


Explain the function and difference of Restricted earth fault, simple earth fault and sensitive earth fault with connection diagram.

2648


How will be the single line diagram of series trip HT breaker? how it works?

2597


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1955


Why is back emf used for a DC motor? Highlight its significance.

1195


In ht capacitor ckt we are using LBS Panel it having isolator with fuse, one of HT fuse flash over, so what is reason behind this event.

2075


Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.

1901


Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078

1808


How do the synchronizing lamps indicate the correctness of phase sequence between existing and incoming alternators?

2174


what is the best transformer oil breakdown voltage?

1117


what is difference between 9kv 5ka surge arrester and 9kv 10ka surge arrester.

1850


On what basis do you decide the ONAN (Oil Natural air natural) or Dry type transformer for a project?

1589


How to select a transformer group to connect a 0,433 KV generation with 33 KV grid in bi directional flow of current

1544


It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.

3861


where rlc series ckt used?

2195