A number of system failures are occurring when corrections
to previously detected errors are resubmitted for acceptance
testing. This would indicate that the maintenance team is
probably not adequately performing which of the following
types of testing?
A. Unit testing
B. Integration testing
C. Design walk-throughs
D. Configuration management
Answer Posted / guest
Answer: B
A common system maintenance problem is that errors are often
corrected quickly (especially when deadlines are tight),
units are tested by the programmer, and then transferred to
the acceptance test area. This often results in system
problems that should have been detected during integration
or system testing. Integration testing aims at ensuring that
the major components of the system interface correctly.
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers