Answer Posted / sundar
oval shape
Is This Answer Correct ? | 0 Yes | 16 No |
Post New Answer View All Answers
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
While testing a ZCT what parameters have to check or measure?
Transformer how to maintaince a check b check c check d check
what will happen if multimeter(selector switch at DC voltage) and terminal at current is connected to DC supply?
I am inpecting a 10kVA UPS what tests should i do and should i observe?
what is the minimum requirement gigaohms for the insulation test using 5kv in 300mm xlpe cable
Mr. mohh sahid m not satisfied for ur answer to the que weather the size of transformer increases or decreases withchange in fr for more detail go to the answer given by me
What are the two major types of control system?
While testing LA mast,What are the parameter limits ?
How each of the following losses occur in d.c machines (i) copper (2)core (3) windage (4)friction please help me
what are inductive and capacitive voltage transformers.what are their applications
Explain Circuit Breaker Trip Characteristics in detail.
In TNC switch, is there any 1NO+1NC block ? and if we move over closing position, is ther any affect on trip position or vice versa?
what are the assumptions made in swineburne's test?